01 / Boat Lifts
AnswerBoat lift installation along the Indian River Lagoon. Lift capacity sized to vessel, not to price point. FDEP-permitted where new pilings are required.

Docks & Lifts
Shoreline & Walls
Golf & Specialty
01 / Boat Lifts
AnswerBoat lift installation along the Indian River Lagoon. Lift capacity sized to vessel, not to price point. FDEP-permitted where new pilings are required.
21
Years on the lagoon & oceanfront
12
Marine disciplines
25-yr
Typical design life
8
Private communities
Anundersizedliftfailswithin3–5yearsinbrackishlagoonconditions.Cablecorrosion,drivemotorfailure,andcradledeformationarethepredictableconsequencesofspecifyingatorbelowwetvesselweight.
Every project runs the full FDEP, USACE, and Indian River County permit pack — filed, tracked, and closed by us.
Stamped structural design against the lagoon's tide, surge, and salt — not a generic catalog spec.
One licensed Florida marine contractor (RG291103858) and one accountable crew — a single point of contact from design to final inspection.




An undersized lift fails within 3–5 years in brackish lagoon conditions. Cable corrosion, drive motor failure, and cradle deformation are the predictable consequences of specifying at or below wet vessel weight. The cost is not just replacement — it is an out-of-service period, a dock repair if the failed lift contacts the structure, and a repeat permit process.
Lift specification begins with the vessel. Keith assesses beam, draft, wet weight (fuel, water, gear loaded), and the existing dock's piling spacing and bearing capacity. If the existing dock piling spacing is not compatible with the lift geometry, or if existing pilings cannot carry the dynamic load of the lift, that is established before any equipment is ordered.
Indian River Lagoon's soft muck substrate requires pilings driven to 10–12 feet minimum bearing depth for lift load support. Properties with organic muck bottom may require helical pilings rather than standard driven pilings — standard pilings can shift over time in soft substrate under dynamic lift loading. The manatee season window (November 15 – March 31) can restrict piling installation.
Lift type is driven by vessel class and water depth. Vertical (cable) lifts are specified for vessels up to 20,000 lb on docks with adequate piling spacing. Hydraulic lifts are specified for vessels requiring cradle tilt or for heavier vessels where cable systems would be undersized. Platform lifts are specified for PWC and smaller vessels. Cradle customization (catamaran beam, deep-V hull, wide-beam sportfisher) is standard practice. We do not specify the catalog default — we specify for the boat.
Boat lift investment is driven by lift capacity, drive system, new piling requirement, and cradle customization — from a standard cable lift on an existing dock up to heavy-capacity hydraulic lifts for sport fishing vessels. We provide itemized scopes.
We don't hand you a warranty document full of fine print. If something we build isn't right, you call us and we come back and make it right. Manufacturer warranties on installed products — hardware, decking, and mechanical systems — pass through to you.
Tell Keith about your project and your waterfront, and we'll follow up with a written estimate.